Garage conversion to habitable room
- Stage 1: commencement, may be combined with stage 2 - minimum two days notice.
- Stage 2: inspect excavation for infill wall / window to replace garage door.
- Stage 3: check DPC in wall and DPM to floor.
- Stage 4: check new floor construction including Insulation and new drains, if needed.
- Stage 5: check new insulation to walls and roof with any associated roof void ventilation.
- Stage 6: check adequacy ventilation to room and adequacy of means of escape in the event of fire.
- Stage 7: completion, may be combined with stage 6 if all OK.