Building Control inspection schedule

You must ask us to inspect works at the relevant stages for your building project. This guide lists the stages of inspection for different type of project.

Garage conversion to habitable room

  • Stage 1: commencement, may be combined with stage 2 - minimum two days notice.
  • Stage 2: inspect excavation for infill wall / window to replace garage door.
  • Stage 3: check DPC in wall and DPM to floor.
  • Stage 4: check new floor construction including Insulation and new drains, if needed.
  • Stage 5: check new insulation to walls and roof with any associated roof void ventilation.
  • Stage 6: check adequacy ventilation to room and adequacy of means of escape in the event of fire.
  • Stage 7: completion, may be combined with stage 6 if all OK.