Translate

Guide to planning applications

Most new buildings, certain alterations and changes in the uses of buildings and land need planning permission.

SuDS requirements - submitted in full

Major applications will not be made valid unless accompanied by these requirements.

 

The application must be submitted with a detailed SuDS design strategy which confirms the following:

 

  • details of how run-off is collected from all hard surfaces to keep water at or near the surface
  • details of source control feature for each sub-catchment
  • details of each site control feature with flow control locations and details
  • details of conveyance features from place to place
  • details of low flow conveyance, overflow and exceeding routes
  • the final storage volumes and flow control rates
  • detail design of regional (catchment) controls in public open space where appropriate
  • the outfall design for “the controlled flow of clean water” from the site
  • plan(s) showing detail of the SuDS including levels, detail locations, detail drawings

Alternatively, you may submit details in accordance with a submission list agreed with us,through a written pre-application response with regard to the same proposal.