Emergency work to a listed building
Emergency work can be carried out to a listed building without prior consent providing you can subsequently prove all of the following:
- that the works were urgently necessary in the interest of:
- safety or health
- the preservation of the building
- it was not practical to secure public safety or health, or preserve the building, by works of repair or temporary support or shelter
- that the work was limited to the minimum measures immediately necessary
- you submitted notice to us as soon as reasonably practicable, in writing, to justify the work in detail